Home > news

Replacement standard for ball mill spare parts

10 Nov 2018 UTC+8Views:

To ensure the normal operation of cement ball mill, the maintenance of the ball mill is a routine work. The effect of the work directly determines the operating efficiency of the ball mill. In order to find out the problems and safety hazards of the ball mill in time, in addition to the routine maintenance, it is also necessary to conduct a thorough inspection of the ball mill and determine the overhaul plan.

The daily maintenance work of the cement ball mill directly affects the operating efficiency of the mill and is a necessary link to ensure the normal operation. In order to be able to detect the problems and safety hazards of the ball mill in time, in addition to routine maintenance, it is also necessary to regularly shut the ball mill down to perform overall inspection.

1. When the wear of the ball mill liner reaches 70%, it should be planned to be replaced. CHAENG specially reminds that if the bolts of the lining plate are seriously damaged and loosen, it should be replaced.

2. If the wear of the ball mill bearing is serious, replace it.

3. If the girth gear of the ball mill is worn, it can be used continuously after switching the surface. When the double-sided wear is serious, replace it. If the pinion gear is worn seriously, it should be replaced.

4. The ball mill can be repaired when the spiral of the feed and discharge is severely worn. If the repair fails, plan to replace it.

5. When the anchor bolt of the ball mill is seriously worn, it must be repaired. If the repair fails, replace it in time.

If you need to replace your ball mill spare parts, CHAENG is exactly the one you are looking for. CHAENG is richly experienced in manufacturing girth gear, ball mill head trunnion and ball mill bearing housing and other large mechanical parts according to drawings. 

ball mill trunnion

 ball mill spare parts

contact@chaeng.co